Your project files
Max file size - 200 MB.
Cost of manufacturing
5.0 6 reviews
for 1piece
add basket
Prices are indicated for printing from a ready-made layout. Delivery in Belarus from 75 rubles for free.

Центры обслуживания, самовывоз
Pick up:
Ул. Гикало, 3
Pick up:
Ул. Б. Хмельницкого, 7
Pick up:
Площадь Независимости
(ТЦ "Столица")
Доставка
Delivery:
Курьер Карандаш
Минск
17,00 руб или бесплатно от 400 руб.
Delivery:
Белпочта
Минск и Беларусь
16,00р. или бесплатно от 100р.
Delivery:
Пункты
Минск и Беларусь
8,00р. или бесплатно от 100р.
Delivery:
Минск и Беларусь
18,00р. или бесплатно от 400р.
Delivery:
Яндекс.Go
Минск и Минский р-н
тарифы Яндекс.Go
Delivery:
Грузовое такси
Минск и Минский р-н
59,00р. или бесплатно от 1000р.
Безопасная оплата
  • Картой или ЕРИП
  • Безналичный расчет
  • При получении в Карандаш или Белпочта
ДЛЯ ЮРИДИЧЕСКИХ ЛИЦ

  • Prices, discounts, deadlines
  • When to update
  • Materials and technologies
  • Sizes

Prices, discounts, deadlines

Production of safety signs, labor protection signs in Minsk with delivery across Belarus


A life-saving plan
An evacuation plan is a necessary document in buildings where there are more than 10 people on a floor at a time. This is the document that is used to conduct practical training during evacuation of people in case of fire, as well as to familiarize employees and visitors in order to save lives in an emergency. We have been successfully producing evacuation plans for over 12 years.

From sketch to document
We develop (draw) evacuation plans according to your sketches and plans, our designers will make the plan in full compliance with the current regulations. The form of the evacuation plan for people in case of fire is established in the Resolution of the Ministry of Emergency Situations of the Republic of Belarus No. 82 dated 12/21/2021. Any evacuation plan has a "You are here" sign (indicating the location of the plan) and contains the following information:
  • Building layout
  • Evacuation exits
  • Arrangement of fire-fighting equipment
  • The scheme of escape routes (main and alternate)
  • Actions of employees in case of fire (text part)
  • Phone numbers of the supervisor and the responsible person on duty

Prices, discounts, deadlines
Name/Quantity121050100
297x420 mm on 200 g/m paper, lamination 250 microns, term and conditions - Urgent16,7716,7710,798,97,55
400x600 mm, on paper 180 g/m, lamination of 100 microns, term and conditions - Promo33,7624,2218,616,9616,96
400x600mm, on paper 180 g/m, lamination of 100 microns, knurling on plastic, term and conditions - Promo64,7954,0837,0632,9131,18
400x600mm, on 200g/m photo paper, framed baguette. tree, term and conditions - Promo91,1491,0188,2582,9782,18
The cost of the work does not include design services for drawing the plan.
  • Other sizes and materials are possible. Please call: +375 17 3 290 290 .
  • Production time (for orders up to 200 rubles): Promotion - 48 hours, Online - 24 hours. Automatic printing of ready-made customer layouts without consulting a specialist. Super-urgent production is possible: please check the possibility and cost by phone +375 17 3 290 290 .
  • When to update

    Updating fire evacuation plans


    When a new plan is needed
    The fire evacuation plan must comply with the provisions of Resolution No. 82 of the Ministry of Emergency Situations of the Republic of Belarus dated 12/21/2021 "On Fire safety". Therefore, it is necessary to order a new evacuation plan in the following cases:
    • Changing the layout of a building or premises - if the building has undergone reconstruction, redevelopment, a change in the purpose of the premises or other similar changes that have affected the escape routes, the location of exits or fire protection facilities, the evacuation plan must be updated in accordance with the new configuration of the facility.
    • Change in the number or composition of people in the building / on the floor - if there is a significant change in the number of people in the building at the same time (for example, an increase in staff, a change in the nature of the facility's use, for example, from office to shopping), the plan must be revised to take into account the new evacuation conditions.
    • Changing the locations of fire-fighting equipment - if the location of fire extinguishers, fire cranes, warning devices or other fire protection elements specified in the plan has changed, it is necessary to update the graphic and text parts of the plan.
    • Identification of inconsistencies during inspections - if violations are detected during the inspection by the state fire supervision authorities (for example, the plan does not match the actual layout or outdated information), the facility manager is obliged to update the plan to eliminate the comments.
    • Changing regulatory requirements - when new regulatory legal acts come into force that establish other requirements for the content or design of the evacuation plan (for example, updating the form of the plan, etc.), existing plans must be brought into line with the new standards.
    • Periodic updating - although there is no direct indication of the mandatory frequency of updating the plan in regulatory documents, it is recommended to regularly check the relevance of the plan (for example, every 1-3 years) as part of general fire safety measures, especially if the facility is subject to frequent changes in operation.

    Materials and technologies

    Materials and technologies for the preparation of an evacuation plan


    Quality and durability
    To ensure that your fire evacuation plans are as visible, durable, and blend harmoniously into the interiors, we use modern technologies and high-quality materials to ensure image clarity, resistance to external influences, and aesthetic appearance.:
    • Paper with lamination is the most budget-friendly and practical option. The plan is printed on thick paper and covered with a lamination film that prevents fading and damage. Such a plan is ready to be placed on the wall at no additional cost.
    • On plastic, a full–color image is printed on a self-adhesive film and glued onto a 2 or 4 mm thick PVC sheet. It is a lightweight, durable and moisture-resistant material, which makes it ideal for rooms with high traffic and non-standard climate.
    • Framed – framing a plan in a baguette frame emphasizes its importance and gives an elegant look, harmoniously complementing the interior of an office, lobby or public space. The glass frame will protect the evacuation plan from external influences, extending its service life.
    • Volumetric – the design is a plastic box with an end face 20-30 mm high. Such an evacuation plan is especially noticeable on the wall due to the three-dimensional effect, which attracts additional attention and facilitates the perception of information even in an emergency situation.

    Sizes

    The size of the evacuation plans


    Any size for your needs
    Any evacuation plan should be easy to read so that people can quickly figure out the escape routes, even in a stressful situation. In general, the size of the fire evacuation plan depends on the configuration of the floor plans on a given floor and their area. The following sizes can usually be used:
    • for rooms up to 500 - 700 sq. m. m - the minimum size of the plan is A3 format (297x420 mm)
    • For rooms up to 1000 sq. m.: the minimum floor plan size is 600x400 mm.
    • For rooms over 1000 sq. m.: the minimum size is 800x600 mm.

    Our equipment and materials used make it possible to produce evacuation plans of almost any size.
    • The maximum dimensions, for example, for a solid—base plan: 1.58 x 3.05 m (the plastic used as the base is 3.05 x 2.03 m, the maximum width of printing on self–adhesive film is 1.58 m, length is 50 m)
    • Maximum dimensions of plates with shaped plastic cutting: 0.9 x 1.4 m

      Instant cost calculation, simple order and payment, convenient shipping methods


      Online ordering in 4 steps:


      1. Select a design to edit from the catalog, create your own in a convenient editor, or upload a ready-made layout.

      2. Specify the order parameters, quantity, and calculate the cost.

      3. Upload photos, edit labels in the editor

      4. Specify the ways to receive your order, select the appropriate payment method


      Convenient payment for retail clients and legal entities:

      • Instant online payment by card or via EPIP
      • Non-cash payment for organizations: cumulative payment system, personal manager
      • The order is without prepayment. Pay upon receipt in Karandash or Belpost


      Fast delivery and receipt of ready orders:

      • In the service centers
      • By courier in Minsk
      • Europost, Belpost, EMS all over Belarus
      • Yandex. Taxi, cargo taxi
      Reviews
      star star star star star
      Convenient online ordering service.Check if something is wrong with the scale of the drawings. Photo printing is better than in another printing center (photo filling without stripes). But once the A3 photo was vertical, it was printed as horizontal. (There were 2 photos in the order, vertical and horizontal, probably we didn't even look at what was printed and how)
      Maria Chrubiankova
      23.12.2024
      star star star star star
      Quality, price and on time!
      Yuri Sheiman
      22.08.2024
      star star star star star
      Willingness to interact, Quality
      Dmitry Krivoshei
      22.08.2021
      star star star star star
      I made an order on the website, printed it out and sent it quickly.
      Anyuta Kurakevich
      13.05.2021
      star star star star star
      "Everything is available, fast enough. After the call center closed, I called for a very long time in order to check the online order marked urgent, but I was warned in advance that the hall was very busy and it would not be easy to get through.
      Maxim Bogdanovich
      20.02.2019
      star star star star star
      They work perfectly! And if there are any questions, they are promptly resolved! I only print photos in pencil, in all other places where I printed earlier, the photos faded after a year.
      Olya Sinkevich
      18.12.2018
      We use cookies, By staying on the site, you accept Public Offer Agreement